DFM & DFA : Building Your Space-Grade PCB Right-First-Time
Your customer wants tested hardware next month and you have budget for a single PCB spin: before sending your ODB++ or Gerber artwork, there are important Design-for-Manufacturing (DFM) checks to ensure your layout complies with formal standards, the fabricator can make it and your new bare-board is returned right-first-time. There are also Design-for-Assembly (DFA) checks to verify your sub-contractor can reliably place parts onto the PCB - I will not sign-off a new build until DFM and DFA have passed!
If a UK contact is preferred, I can introduce to Nick Bell on our UK team.
Thanks
Sid
Regards,
Wolfram